I appreciate the risk score calculator and the cost justification calculator, quite useful tools. I work in rather low risk manufacturing facility and the range of the cost of correction is too high for my purposes, with $50,000.00 being ideal top end of the range for me. Is there a way to edit this?
brhttps://safetyrisk.net/risk-control-cost-justification-calculator/
Prompt